New Build Home Construction
Build a new home on your own plot with TACMAN Developers. We offer design, planning support and construction across the UK. Whether you’re starting with a site or already have drawings, we can discuss what is needed to get your project ready to build.

Start With the Plot
Before settling on a floor plan, look at what the site will allow. The position of the access, changes in ground level and the route for drainage can affect where the home sits and how much it costs to build.
Bring a site plan, any surveys, and a short list of priorities. Tell us how you want the house to work, from where you come in with the shopping to which rooms should open onto the garden.
New Build Design and Construction Services

Home Design and Layout
Plan the house around the plot, daylight and everyday use. Agree which drawings and design work are included.
Planning and Technical Preparation
Identify the approvals and technical information your project needs, including who prepares the drawings and calculations.
Construction and Finishing
Agree the work from groundworks and structure through to services and interior finishes, with inclusions set out in the build scope.
New Build Projects We Can Discuss
Tell us what you want to build and what information you already have. The right starting point depends on the site and the stage of your plans.

Self-Build on Your Plot
Plan a one-off home around the site, your priorities and the budget available for the build.
Replacement Homes
Consider demolition, access and whether existing service connections can be reused before pricing a replacement dwelling.
Infill Plots
On a site between existing homes, check access for deliveries, space to work and the relationship to neighbours.
Construction From Existing Plans
Share your drawings and specification so we can identify what is still needed to price the work.
Single-Storey Homes
Plan step-free access where the site allows and consider how rooms connect without a staircase.
Energy Efficiency Priorities
Discuss insulation, window choices and heating early so they can be considered together in the design and budget.
Still deciding where to start? Send a site plan and tell us whether you need design support or a build estimate.
How Our New Build Process Works
Four stages, from discussing your plot to handing over your new home.

- 1Step 1 of 4
Discuss Your Brief
Share your plot location, drawings, budget and priorities.
- 2Step 2 of 4
Review the Plot and Design
Identify site constraints, approvals and any specialist input needed.
- 3Step 3 of 4
Agree the Build Scope
Review the specification, estimate, exclusions and programme before work starts.
- 4Step 4 of 4
Build and Hand Over
Coordinate the agreed works, review outstanding items and confirm the handover documents.
Costs, Timescales and What Is Included
New build costs depend on floor area, ground conditions, site access and the finish you choose. Compare estimates against the same drawings and specification. Check who pays for surveys, demolition, utility connections and landscaping, and how provisional allowances and VAT are treated.
Allow separately for design, approvals and construction. Confirm when key choices such as windows, heating and kitchen fittings need to be made so they can be ordered in time.
Areas We Serve
We welcome new home enquiries from Slough, Reading and Maidenhead and consider plots elsewhere in the UK. Send the site postcode so we can discuss availability for your project.

Slough
Reading
Maidenhead
Other Locations
Tell Us About Your Plot and Plans
Send the plot postcode, your current planning stage and any drawings you have. Let us know what you want to build and your budget range so we can discuss the next step.

New Build Home FAQs
Quick answers for homeowners planning a new home on their own plot.
Do I need planning permission to build a new home?
Usually, yes. Planning permission and building regulations approval are separate. Check the requirements and any conditions for your site before starting work.
Can I enquire before buying a plot?
Yes. Share the site location and any planning information. Access, services and ground conditions are worth investigating before committing to a build budget.
Can you price a build from my existing plans?
Send the drawings, specification and any planning or structural documents. We can discuss what else is needed to prepare an estimate.
How long does it take to build a house?
The programme depends on the size of the house, site preparation, design complexity and when materials and services are available. Ask for dates based on the agreed scope.
Are the kitchen and bathrooms included?
That depends on the specification. Check which units, fittings and installation are included, what has a budget allowance and what you need to buy separately.
What should I receive at handover?
Agree which documents will be supplied, such as relevant completion certificates, test records, product manuals and any warranties included in the contract.